October 15th, 2012 KLLC signed the contract for unstuffing and carrying the lines of boiler with 25 containers 40’ from Haiphong Port to Quynhon – Danang Port.
October 15th, 2012 KLLC signed the contract for unstuffing and carrying the lines of boiler with 25 containers 40’ from Haiphong Port to Quynhon – Danang Port.
Some typical photos: